SAIC Chase G10 offline, sales soon

SAIC Chase G10 offline, sales soon

On March 21, 2014, SAIC Chase G10 officially went offline. According to official sources, SAIC Chase G10 will be officially sold in April and May. SAIC Chase G10 will launch seven models after the listing, after the manufacturers announced the SAIC Chase G10 price range, for 129,800 -219,800 yuan. However, specific vehicle pricing will not be known until after listing.

The Chase G10 was unveiled at the Guangzhou Auto Show held at the end of last year. This whole area MPV built by SAIC Chase and relying on the Group's advantages and integrated technical resources will be combined with the V80 “both wings”. The size and length of the Chase G10 are 5168mm/1980mm/1928mm, and the wheelbase is 3210mm. The whole series has three interior layouts of 7, 9, and 10 seats.

In terms of configuration, the new car is equipped with a canopy-type panoramic electric sunroof, keyless entry and one-button activation system, inductive wiper, and adaptive xenon headlamps. Chase G10 uses the European body structure design, assembly BOSCH the latest generation of ESP systems, vehicles using Layer Build multi-layer welding technology to ensure the safety of vehicles.

The new car offers 2.4L and 2.0T gasoline engines. 2.0T engine maximum power 165kW, maximum torque 345Nm, vehicle maximum speed 190km/h. For the transmission system, the automatic transmission uses ZF ZF's automatic transmission. The new vehicle emissions have reached the Euro 5 standard, and diesel models are expected to be launched later.

After the SAIC G10 is listed, it will compete with old models such as the GL8 and Ruifeng M5 that are still being sold. Although compared with its competitors, SAIC Chase G10 is slightly lower in popularity, but with a more stylish appearance and superior driving force, SAIC Chase G10 still has the strength to compete with competitors.

Disposable Chopsticks Kitchenware

Disposable Chopsticks kitchenware

Wooden Spoon Fork Knife989

ea9d5b081e17c68492392e8a6ea0172


FAQ

Q1: Are you manufacturer or trading company?

A1: We are manufacturer.

Q2: What is the material of products?

A2: Natural Birch.
Q3: How long will you deliver the products?
A3: 30~60 days after receiving 30% T/T deposit.
Q4: What is the payment term?
A4: T/T 30% as deposit in advance and balance 70% should be paid when goods ready to ship or L/C at sight.

Q5: Do you provide samples?

A5:Yes, free samples available.

Disposable Chopsticks Kitchenware,Disposable Cutlery Chopsticks Kitchenware,Disposable Chopsticks,Disposable Wooden Chopsticks

Dalian Yongtailong Wood Industry Co.,Ltd , https://www.ytldisposablegoods.com